@林伟
我们把自研 ERP 的库存查询和采购申请接进来了,分享几点:
- 先写 manifest,再写代码
- conformance 52 项全过之后再上线
- 采购申请一律走提案 + 审批
Thread not found. It may have been deleted or hidden.
This thread is waiting for review by the moderators. Until then, only you can see it.
The moderators have hidden this thread (only you can see it).
This thread is locked. New replies are not possible.
我们把自研 ERP 的库存查询和采购申请接进来了,分享几点:
Thanks for sharing! How long did the first endpoint take?
第一个接口大概两天,主要时间花在权限设计上。